Date code confirmed at allocation (no impact on performance)
Powell Agriculture Connectors
- 1000 arrives in 3 to 5 days; Manufacturing lead time: 10 weeks
Manufacturer
Powell Agriculture
Powell Material Number
1200027710
Product Category
Agricultural Connectors
Factory Lead Time: 10 Weeks, MOQ: 1
Packaged individually in Bags
*All prices shown are exclusive of GST.
We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.