Harwin M80-4S10442F9

51 in stock

Date code confirmed at allocation (no impact on performance)

Harwin Datamate J-Tek

- 51 arrives in 3 to 5 days; Manufacturing lead time: 15 weeks

Manufacturer

Harwin

Powell Material Number

1003514956

Product Category

High Reliability Rectangular Connectors

Factory Lead Time: 15 Weeks, MOQ: MOQ 1 if stocked, else MOQ 54

Quantity

Price (INR)

1 ₹1,322.50
5 ₹1,127.78
10 ₹924.04
25 ₹1,418.06

Tubes of 18

*All prices shown are exclusive of GST.

MOQ - 1 ₹1322.5
Image representing the style and polarization of the Harwin M80-4S10442F9
Front View
Technical

Downloads

You must be logged in to download these files Login here.

Specifications

We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.