Harwin M80-4612242

56 in stock

Date code confirmed at allocation (no impact on performance)

Harwin Datamate J-Tek

56 arrives in 1 to 2 days; Manufacturing lead time: 9 weeks

Manufacturer

Harwin

Powell Material Number

1003513302

Product Category

High Reliability Rectangular Connectors

Factory Lead Time: 9 Weeks, MOQ: MOQ 1 if stocked, else MOQ 56

Quantity

Price (INR)

1 ₹1,543.37
5 ₹1,316.19
10 ₹1,078.19
25 ₹2,575.59

Bulk/Loose

*All prices shown are exclusive of GST.

MOQ - 1 ₹1543.37
Image representing the style and polarization of the Harwin M80-4612242
Front View
Technical

Downloads

You must be logged in to download these files Login here.

Specifications

We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.