Harwin M80-4152098

53 in stock

Date code confirmed at allocation (no impact on performance)

Harwin Datamate J-Tek

- 53 arrives in 3 to 5 days; Manufacturing lead time: 9 weeks

Manufacturer

Harwin

Powell Material Number

1003512908

Product Category

High Reliability Rectangular Connectors

Factory Lead Time: 9 Weeks, MOQ: MOQ 1 if stocked, else MOQ 95

Quantity

Price (INR)

1 ₹494.02
5 ₹421.90
10 ₹345.27
25 ₹585.07

Bulk/Loose

*All prices shown are exclusive of GST.

MOQ - 1 ₹494.02
Image representing the style and polarization of the Harwin M80-4152098
Front View
Technical

Downloads

You must be logged in to download these files Login here.

Specifications

We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.