Harwin M80-4141698

23 in stock

Date code confirmed at allocation (no impact on performance)

Harwin Datamate J-Tek

- 23 arrives in 3 to 5 days; Manufacturing lead time: 9 weeks

Manufacturer

Harwin

Powell Material Number

1003512882

Product Category

High Reliability Rectangular Connectors

Factory Lead Time: 9 Weeks, MOQ: MOQ 1 if stocked, else MOQ 110

Quantity

Price (INR)

1 ₹427.31
5 ₹364.21
10 ₹298.40
25 ₹430.02

Bulk/Loose

*All prices shown are exclusive of GST.

MOQ - 1 ₹427.31
Image representing the style and polarization of the Harwin M80-4141698
Front View
Technical

Downloads

You must be logged in to download these files Login here.

Specifications

We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.