Date code confirmed at allocation (no impact on performance)
Corning Gilbert RF Connectors
- 4 arrives in 3 to 5 days; Manufacturing lead time: 26 weeks
Manufacturer
Corning Gilbert
Powell Material Number
1005479852
Product Category
RF Connectors
Factory Lead Time: 26 Weeks, MOQ: 1
GPO 50 Ohm Hermetic Seal (variant: 06) Female 1/2 Watt 50 Ohm Load 50 Ohm Hermetic Seal Packaged individually in bags
*All prices shown are exclusive of GST.
We know this page isn’t quite up to our usual standards yet — we’re still adding detailed technical information and images. Thanks for bearing with us while we improve this listing.